/ Instrumentation


LED based calibration systems of the Baikal-GVD neutrino telescope


Avrorin, A.D. (Moscow, INR) ; Avrorin, A.V. (Moscow, INR) ; Aynutdinov, V.M. (Moscow, INR) ; Bannash, R. (BESSY, Berlin) ; Belolaptikov, I.A. (Dubna, JINR) ; Bogorodsky, D.Yu. (Irkutsk State U.) ; Brudanin, V.B. (Dubna, JINR) ; Budnev, N.M. (Irkutsk State U.) ; Danilchenko, I.A. (Moscow, INR) ; Domogatsky, G.V. (Moscow, INR) ; Doroshenko, A.A. (Moscow, INR) ; Dyachok, A.N. (Irkutsk State U.) ; Dzhilkibaev, Zh.A.M. (Moscow, INR) ; Fialkovsky, S.V. (Nizhnii Novgorod State Tech. U.) ; Gafarov, A.R. (Irkutsk State U.) ; Gaponenko, O.N. (Moscow, INR) ; Golubkov, K.V. (Moscow, INR) ; Gress, T.I. (Irkutsk State U.) ; Honz, Z. (Dubna, JINR) ; Kebkal, K.G. (BESSY, Berlin) ; Kebkal, O.G. (BESSY, Berlin) ; Konischev, K.V. (Dubna, JINR) ; Korobchenko, A.V. (Dubna, JINR) ; Koshechkin, A.P. (Moscow, INR) ; Koshel, F.K. (Moscow, INR) ; Kozhin, A.V. (SINP, Moscow) ; Kulepov, V.F. (Nizhnii Novgorod State Tech. U.) ; Kuleshov, D.A. (Moscow, INR) ; Ljashuk, V.I. (Moscow, INR) ; Milenin, M.B. (Nizhnii Novgorod State Tech. U.) ; Mirgazov, R.A. (Irkutsk State U.) ; Osipova, E.R. (SINP, Moscow) ; Panfilov, A.I. (Moscow, INR) ; Pan'kov, L.V. (Irkutsk State U.) ; Pliskovsky, E.N. (Dubna, JINR) ; Rozanov, M.I. (St. Petersburg, Marine Tech U.) ; Rjabov, E.V. (Irkutsk State U.) ; Shaybonov, B.A. (Dubna, JINR) ; Sheifler, A.A. (Moscow, INR) ; Shelepov, M.D. (Moscow, INR) ; Skurihin, A.V. (SINP, Moscow) ; Smagina, A.A. (Dubna, JINR) ; Suvorova, O.V. (Moscow, INR) ; Tabolenko, V.A. (Irkutsk State U.) ; Tarashansky, B.A. (Irkutsk State U.) ; Yakovlev, S.A. (BESSY, Berlin) ; Zagorodnikov, A.V. (Irkutsk State U.) ; Zhukov, V.A. (Moscow, INR) ; Zurbanov, V.L. (Irkutsk State U.)

Published in: EPJ Web Conf.
Year: 2016
Vol.: 116
Page No: 06005
Pages: 5
Year: 2016-04-11 published

Abstract: Baikal-GVD is a cubic-kilometer scale neutrino telescope, which is currently under construction in Lake Baikal. GVD will consist of an array of optical modules arranged in clusters of strings. The first GVD-cluster has been deployed and put in operation in April 2015. We describe equipment and methods for the calibration of the first GVD-cluster and discuss the accuracy of the calibration procedures.

Total numbers of views: 1003
Numbers of unique views: 414
DOI: 10.1051/epjconf/201611606005
 Record created 2016-05-04, last modified 2016-05-04



Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)