/ Experiment-HEP


Status of the Baikal-GVD Project


Avrorin, A.D. (Moscow, INR) ; Avrorin, A.V. (Moscow, INR) ; Aynutdinov, V.M. (Moscow, INR) ; Bannasch, R. (BESSY, Berlin) ; Belolaptikov, I.A. (Dubna, JINR) ; Bogorodsky, D.Yu. (Irkutsk State U.) ; Brudanin, V.B. (Dubna, JINR) ; Budnev, N.M. (Irkutsk State U.) ; Danilchenko, I.A. (Moscow, INR) ; Domogatsky, G.V. (Moscow, INR) ; Doroshenko, A.A. (Moscow, INR) ; Dyachok, A.N. (Irkutsk State U.) ; Dzhilkibaev, Zh.-A.M. (Moscow, INR) ; Fialkovsky, S.V. (Nizhnii Novgorod State Tech. U.) ; Gafarov, A.R. (Irkutsk State U.) ; Gaponenko, O.N. (Moscow, INR) ; Golubkov, K.V. (Moscow, INR) ; Gress, T.I. (Irkutsk State U.) ; Honz, Z. (Dubna, JINR) ; Kebkal, K.G. (BESSY, Berlin) ; Kebkal, O.G. (BESSY, Berlin) ; Konishchev, K.V. (Dubna, JINR) ; Konstantinov, E.N. (Irkutsk State U.) ; Korobchenko, A.V. (Irkutsk State U.) ; Koshechkin, A.P. (Moscow, INR) ; Koshel, F.K. (Moscow, INR) ; Kozhin, V.A. (SINP, Moscow) ; Kulepov, V.F. (Nizhnii Novgorod State Tech. U.) ; Kuleshov, D.A. (Moscow, INR) ; Ljashuk, V.I. (Moscow, INR) ; Milenin, M.B. (Nizhnii Novgorod State Tech. U.) ; Mirgazov, R.A. (Irkutsk State U.) ; Osipova, E.R. (SINP, Moscow) ; Panfilov, A.I. (Moscow, INR) ; Pankov, L.V. (Irkutsk State U.) ; Perevalov, A.A. (Irkutsk State U.) ; Pliskovsky, E.N. (Dubna, JINR) ; Poleshuk, V.A. (Irkutsk State U.) ; Rozanov, M.I. (St. Petersburg, Marine Tech U.) ; Rubtsov, V.F. (Irkutsk State U.) ; Rjabov, E.V. (Irkutsk State U.) ; Shaybonov, B.A. (Moscow, INR) ; Sheifler, A.A. (Moscow, INR) ; Skurikhin, A.V. (SINP, Moscow) ; Smagina, A.A. (Dubna, JINR) ; Suvorova, O.V. (Moscow, INR) ; Tarashchansky, B.A. (Irkutsk State U.) ; Yakovlev, S.A. (BESSY, Berlin) ; Zagorodnikov, A.V. (Irkutsk State U.) ; Zhukov, V.A. (Moscow, INR) ; Zurbanov, V.L. (Irkutsk State U.)

Year: 2015
Page No: 98-101
Pages: 4
Year: 2015 published

Abstract: The prototyping phase of the BAIKAL-GVD project has been started in April 2011 with the deployment of a three string engineering array which comprises all basic elements and systems of the Gigaton Volume Detector (GVD) in Lake Baikal. In April 2012 the version of engineering array which comprises the first full-scale string of the GVD demonstration cluster had been deployed and operated during 2012. The first stage of the GVD demonstration cluster which consists of three strings was deployed in April 2013. We review the prototyping phase of the BAIKAL-GVD project and describe the configuration and design of the 2013 engineering array.

Total numbers of views: 750
Numbers of unique views: 270
DOI: 10.1142/9789814663618_0019
 Record created 2015-07-01, last modified 2015-07-01



Rate this document:

Rate this document:
1
2
3
 
(Not yet reviewed)